Need some help from those that have experience building decks.

Our deck is approximately 60 feet by 16 feet. The first 24 feet is what use to be an enclosed sunroom but the prior owners converted it to part of the deck some many years ago. The wood there is in excellent condition. The problem is the other 36 or so feet is heavily rotting and also has a hot tub at one end that they did not properly support underneath. That section of the deck has settled approximately 5 inches around the hot tub.

The deck is built with dual 2x12s (one on each side of the 4x4 support post) on 8 foot centers coming off the house. On top of those are 2x8s run every 24 inches parallel to the house.

My goal, once I get the hot tub off the deck, is to kill two birds with one stone. My question is how. I want to replace the wood boards with a Trex type decking material. My plan is possibly only replace the portion not where the sunroom is. Can I cut into the 2x8s at all to relevel the deck? If not, is the only option to butt another 2x8 up to the 2x8 already there and start releveling the deck that way?
Carrying Concealed Handguns - Signage Answers

Ohio Concealed Carry Classes in S/W Ohio
http://www.ProShootersTraining.com

I am not a lawyer. My answers are based on research, knowledge, and are generally backed up with facts, the Ohio Revised Code, or the United States Code.
User avatar
JediSkipdogg
 
Posts: 10134
Joined: Sun Jul 27, 2008 3:03 pm
Location: Batavia

Re: Deck Construction/Remodeling Question

Postby ESAFO » Mon Jun 11, 2018 3:15 am

JediSkipdogg wrote:My goal, once I get the hot tub off the deck, is to kill two birds with one stone. My question is how. I want to replace the wood boards with a Trex type decking material. My plan is possibly only replace the portion not where the sunroom is. Can I cut into the 2x8s at all to relevel the deck? If not, is the only option to butt another 2x8 up to the 2x8 already there and start releveling the deck that way?

Sawzall will speed this project up alot & yes will cut through any nail or screw already holding existing decking in place, this way you can still use existing 4x4 already in place as long as there not part of the problem.
Have you checked 4x4 to make sure there also level?
BOB
S&W 686,629,500, XDM 40
G30,34,35,40,41, Shield 9, M&P 45
Weatherby Reaper, H&R, Persuader
S&W 4506,5906, SD9, Sport II, Shockwave 12ga
User avatar
ESAFO
 
Posts: 896
Joined: Fri Oct 05, 2012 10:20 pm
Location: Hubbard, Oh

Re: Deck Construction/Remodeling Question

Postby ESAFO » Mon Jun 11, 2018 4:24 am

You may also want to think about once you remove old decking to install another 4x4 for added support underneath where hot tub will be reset.
BOB
S&W 686,629,500, XDM 40
G30,34,35,40,41, Shield 9, M&P 45
Weatherby Reaper, H&R, Persuader
S&W 4506,5906, SD9, Sport II, Shockwave 12ga
User avatar
ESAFO
 
Posts: 896
Joined: Fri Oct 05, 2012 10:20 pm
Location: Hubbard, Oh

Re: Deck Construction/Remodeling Question

Postby JediSkipdogg » Mon Jun 11, 2018 5:51 am

ESAFO wrote:You may also want to think about once you remove old decking to install another 4x4 for added support underneath where hot tub will be reset.


My plan is OFF the deck and to build a small 2 foot wide walkway around it so the tub is level with the deck. And then a gate for child control. This way I don't have to worry about the deck settling any more. From what I can tell, they added extra support. But my guess is, simply not enough for I'm guessing 400 lbs of water plus tub.
Carrying Concealed Handguns - Signage Answers

Ohio Concealed Carry Classes in S/W Ohio
http://www.ProShootersTraining.com

I am not a lawyer. My answers are based on research, knowledge, and are generally backed up with facts, the Ohio Revised Code, or the United States Code.
User avatar
JediSkipdogg
 
Posts: 10134
Joined: Sun Jul 27, 2008 3:03 pm
Location: Batavia

Re: Deck Construction/Remodeling Question

Postby ESAFO » Mon Jun 11, 2018 6:34 am

Okay well since that is the case I would go to the contractors desk at a local Lowe's or Home Depot and they will be able to give you the proper info you will need per square inch rating for the size and weight of hot tub.
This way it takes all the guesswork out and you have proper info for the size of the hot tub.
Also you can tell them your exact plans and measurements what you're working with now.
Also take several different pictures from different angles to show them this way they know exactly what they're dealing with and they could probably even draw it up on their computer for you.
BOB
S&W 686,629,500, XDM 40
G30,34,35,40,41, Shield 9, M&P 45
Weatherby Reaper, H&R, Persuader
S&W 4506,5906, SD9, Sport II, Shockwave 12ga
User avatar
ESAFO
 
Posts: 896
Joined: Fri Oct 05, 2012 10:20 pm
Location: Hubbard, Oh

Re: Deck Construction/Remodeling Question

Postby evan price » Mon Jun 11, 2018 9:36 am

JediSkipdogg wrote: But my guess is, simply not enough for I'm guessing 400 lbs of water plus tub.

Water is eight pounds per gallon more like 4000 pounds minimum.
"20% accurate as usual, Morty."

Striking down evil with the mighty sword of teamwork and the hammer of not bickering!
Carpe Noctem- we get more done after 2 am than most people do all day.
User avatar
evan price
Forum Janitor
Forum Janitor
 
Posts: 8856
Joined: Sun Jul 02, 2006 9:23 pm
Location: Westfield, Ohio

Re: Deck Construction/Remodeling Question

Postby JediSkipdogg » Mon Jun 11, 2018 10:44 am

evan price wrote:
JediSkipdogg wrote: But my guess is, simply not enough for I'm guessing 400 lbs of water plus tub.

Water is eight pounds per gallon more like 4000 pounds minimum.


I meant 400 gallons. So I figure loaded is about 3000 lbs in like a 7x7 area. I'm just not sure moving it, building up the supports, and such would even be a good idea. Therefore, I figure take it off the deck, then build the deck around it so it's like an in-deck hottub.
Carrying Concealed Handguns - Signage Answers

Ohio Concealed Carry Classes in S/W Ohio
http://www.ProShootersTraining.com

I am not a lawyer. My answers are based on research, knowledge, and are generally backed up with facts, the Ohio Revised Code, or the United States Code.
User avatar
JediSkipdogg
 
Posts: 10134
Joined: Sun Jul 27, 2008 3:03 pm
Location: Batavia

Re: Deck Construction/Remodeling Question

Postby ESAFO » Mon Jun 11, 2018 11:54 am

I don't see there being a cost savings doing it either way the main benefit with taking it completely out setting it deck height and starting all over is that you will know that it is properly done.
It sounds like the direction you want to go is remove the tub set it deck height and start fresh especially for the peace of mind in knowing it is supported correctly.
This in return will also make the original deck repair a lot easier removing old replacing new.
BOB
S&W 686,629,500, XDM 40
G30,34,35,40,41, Shield 9, M&P 45
Weatherby Reaper, H&R, Persuader
S&W 4506,5906, SD9, Sport II, Shockwave 12ga
User avatar
ESAFO
 
Posts: 896
Joined: Fri Oct 05, 2012 10:20 pm
Location: Hubbard, Oh

Re: Deck Construction/Remodeling Question

Postby TJW815 » Mon Jun 11, 2018 4:54 pm

Anytime a hot tub is on a deck it should be 6x6s not 4x4s. Also, if you want to use a composite deck material take into co side ration it is heavier.

For the part that has settled, I’d dig out the post footer, jack it up to level, and pour in some concrete to set the post back on.

As far as cutting into the 2x8s, I’d need you to explain it better what you’re trying to accomplish.
Plush
User avatar
TJW815
 
Posts: 2439
Joined: Wed Oct 10, 2012 7:13 pm
Location: Warren County

Re: Deck Construction/Remodeling Question

Postby JediSkipdogg » Mon Jun 11, 2018 8:41 pm

TJW815 wrote:Anytime a hot tub is on a deck it should be 6x6s not 4x4s. Also, if you want to use a composite deck material take into co side ration it is heavier.


Anyone have experience if the composites are worth the extra cost? I figure planning to live here a long time, overall it would be worth it. No need to stain or do anything else to it over the years from my understanding.

TJW815 wrote:For the part that has settled, I’d dig out the post footer, jack it up to level, and pour in some concrete to set the post back on.


You think it could still settle more? The hot tub is a 2002 model I believe. So it's been on the deck for at least 16 years. I'm thinking all settling has been finished and it would be best to not mess with trying to jack a ton of posts up at the same time.


TJW815 wrote:As far as cutting into the 2x8s, I’d need you to explain it better what you’re trying to accomplish.
Plush


I'm thinking that's a no go. I was thinking if it only settled an inch or two it may be possible. But since I'm talking 5 inches at the most, I can't cut any part of a 2x8 into a 2x3 and expect support from it.
Carrying Concealed Handguns - Signage Answers

Ohio Concealed Carry Classes in S/W Ohio
http://www.ProShootersTraining.com

I am not a lawyer. My answers are based on research, knowledge, and are generally backed up with facts, the Ohio Revised Code, or the United States Code.
User avatar
JediSkipdogg
 
Posts: 10134
Joined: Sun Jul 27, 2008 3:03 pm
Location: Batavia

Re: Deck Construction/Remodeling Question

Postby ashtabula » Tue Jun 12, 2018 4:10 am

An easy way to level would be to disconnect the double 2x12 at the sunken post, jack up the 2x12 until level, then reinstall to the post. 5'' is a bit so you will need to cut a piece of post to set on top of the old post between the 2x12, then bolt a new post, it does not need to be the full height of the existing post, behind the old one between the 2x12. Secure the new post to the 2x12. If there is a skirt along the outside, you would need to disconnect that prior to raising, then reconnect. Keep in mind the skirt board may or may not connected to the post, it may be nailed to the 2x12 if that's the case do nothing it will raise with the deck.
ashtabula
 
Posts: 141
Joined: Fri Feb 06, 2015 11:06 am

Re: Deck Construction/Remodeling Question

Postby 502ci » Tue Jun 12, 2018 11:20 am

As far as composite material that is what I went with and though it has been in place only 4 years so far it still looks like it was just installed. Should be good for 25 years according to it's specs. I will say I was amazed how much heavier the boards are...I am gonna guess, they might be twice as heavy as pressure treated boards.
Nothing to see here...move along.
User avatar
502ci
OFCC Member
OFCC Member
 
Posts: 710
Joined: Sat Mar 01, 2008 5:21 pm
Location: Richfield, Oh

Re: Deck Construction/Remodeling Question

Postby TJW815 » Tue Jun 12, 2018 8:33 pm

Sorry for all the spelling errors. Fat fingers and too lazy to proofread lol.

Composite is great if you install it correctly. Some very important things. Use the hidden fasteners(screws at an angle through the side). Properly gap the boards. Properly clean and seal all non composite parts of deck before you install composite using premium sealers.

Benefits:
No splinters
No staining
No sanding
Only need to Pressure wash it occasionally (less if boards are gapped correctly)

Buy a couple extra boards and store under the deck as a just in case for a few years down the road. Same with any handrails or spindles.
User avatar
TJW815
 
Posts: 2439
Joined: Wed Oct 10, 2012 7:13 pm
Location: Warren County

Re: Deck Construction/Remodeling Question

Postby AlanM » Wed Jun 13, 2018 8:00 am

Just out of curiosity, what's the name of composite decking you're planning on using?
I'm just trying to visualize your situation.

There's a member here that had a beautiful deck added to his house using long 2 x 4 (2 x 6?) Trex boards.
That was quite a few years ago. Trex has significantly expanded their line of products since then.
AlanM
There are no dangerous weapons; there are only dangerous men. - RAH
Four boxes to be used in defense of liberty: soap, ballot, jury, ammo - use in that order.
If you aren't part of the solution, then you obviously weren't properly dissolved.
User avatar
AlanM
 
Posts: 9053
Joined: Mon Jul 04, 2005 1:38 am
Location: Was Stow, OH now Charlottesville, VA

Re: Deck Construction/Remodeling Question

Postby TJW815 » Fri Jun 15, 2018 12:43 pm

I recommend timbertech brand composite decking. Good product and made here in Ohio, in Wilmington
User avatar
TJW815
 
Posts: 2439
Joined: Wed Oct 10, 2012 7:13 pm
Location: Warren County

Next

Return to Jeff Kirchner's Korner

Who is online

Users browsing this forum: Majestic-12 [Bot] and 4 guests

cron